Title 12 STREETS AND SIDEWALKS*
Chapter 12.03 PUBLIC RIGHTS-OF-WAY
12.03.040 Types of permits.
(a) Utility permit. This permit allows cable operators and utilities to
use the public right-of-way for initial location and installation of
cable/utility lines within the boundaries of the town of
Speedway.
(b) Excavation permit. This permit is required whenever
excavation is being made in the paved areas of the public right-of-way. This
permit includes the use of the lane in which excavation is located. To the
fullest extent reasonably possible without impeding the restoration of needed
utility services or when a clear and present danger to public safety is
demonstrated, the town may restrict excavation in streets that have been
constructed or resurfaced within two years prior to the permit application
date.
(c) Non-paved area permit. This permit is required whenever
excavation is being made in the non-paved areas of the public right-of-way. The
permit includes the use of the lane adjacent to the
excavation.
(d) Trenchless or boring permit. This permit is required
whenever trenchless or boring operations are used and all incidental excavation
is in the non-paved areas. The permit includes the use of the lane adjacent to
the excavation.
(e) Emergency permits. This permit is authorized when
situations arise which are described in Section 12.03.080.
(f) Right-of-way
use permit. This permit is required whenever there are activities performed in
the public right-of-way which are not described above.
All permits will be
issued by the town’s clerk-treasurer on forms approved by the town
council. All permit fees, except for utility permit fees, shall be waived where
a fee is charged by the city of Indianapolis for the same use along the
thoroughfare right-of-way. (Ord. 949 § 1(part), 2001).