12.03.060 Rights of way access permit fees.

(a) Utility permit: The permit fee shall be two thousand dollars per cable operator or utility.
(b) Excavation permits:
(1) The permit fee shall be $1.50 per square foot, per block with a five hundred dollar minimum and a two thousand dollar maximum for streets constructed or resurfaced within two years prior to the permit application.
(2) The permit fee shall be one dollar per square foot, per block with a one hundred dollar minimum and a one thousand dollar maximum for all other streets.
(3) On streets where public utilities certify repair to the town, the permit fee shall be fifty dollars.
(c) Non-paved area permits. The permit fee shall be fifty dollars.
(d) Trenchless or boring permits.
(1) The permit fee shall be seventy five dollars within all streets constructed or resurfaced within two years prior to the permit application.
(2) The permit fee shall be fifty dollars for all other streets.
(e) Emergency permits. The permit fee shall be one and one-half times the applicable permit.
(f) Right-of-way use permits:
Type 1: For use of sidewalks or non-paved areas, the permit fee shall be fifty dollars per block per week.
Type 2: For use of traffic lane, parking lanes, or shoulders on non-thoroughfare street; the permit fee shall be fifty dollars per block per week.
Type 3: For use of traffic lanes, parking lanes, or shoulders which are in addition to those covered by an excavation permit; the permit fee shall be seventy five dollars per block per week.
Type 4: For use of traffic lanes on non-thoroughfare street, the permit fee shall be fifty dollars per block per week.
All permit fees will be payable to the town of Speedway and paid at the office of the town’s clerk-treasurer. (Ord. 949 § 1(part), 2001).