Title 12 STREETS AND SIDEWALKS*
Chapter 12.03 PUBLIC RIGHTS-OF-WAY
12.03.060 Rights of way access permit fees.
(a) Utility permit: The permit fee shall be two thousand dollars per
cable operator or utility.
(b) Excavation permits:
(1) The permit fee
shall be $1.50 per square foot, per block with a five hundred dollar minimum and
a two thousand dollar maximum for streets constructed or resurfaced within two
years prior to the permit application.
(2) The permit fee shall be one
dollar per square foot, per block with a one hundred dollar minimum and a one
thousand dollar maximum for all other streets.
(3) On streets where public
utilities certify repair to the town, the permit fee shall be fifty
dollars.
(c) Non-paved area permits. The permit fee shall be fifty
dollars.
(d) Trenchless or boring permits.
(1) The permit fee shall be
seventy five dollars within all streets constructed or resurfaced within two
years prior to the permit application.
(2) The permit fee shall be fifty
dollars for all other streets.
(e) Emergency permits. The permit fee shall
be one and one-half times the applicable permit.
(f) Right-of-way use
permits:
Type 1: For use of sidewalks or non-paved areas, the permit fee
shall be fifty dollars per block per week.
Type 2: For use of traffic lane,
parking lanes, or shoulders on non-thoroughfare street; the permit fee shall be
fifty dollars per block per week.
Type 3: For use of traffic lanes, parking
lanes, or shoulders which are in addition to those covered by an excavation
permit; the permit fee shall be seventy five dollars per block per
week.
Type 4: For use of traffic lanes on non-thoroughfare street, the
permit fee shall be fifty dollars per block per week.
All permit fees will
be payable to the town of Speedway and paid at the office of the town’s
clerk-treasurer. (Ord. 949 § 1(part), 2001).
<< previous | next >>