13.04.040 Water usage schedule.

The water usage schedule, on which the amount of the sewage rates and charges shall be determined, shall be as follows:
(1) All Users.
Consumption per Month (Per 1,000 Gallons)
Phase I Rates1
Phase II Rates2
Phase III Rates3
First
25,000
$2.61
$2.73
$2.84
Next
75,000
2.55
2.67
2.78
Next
250,000
2.30
2.40
2.51
Next
500,000
2.13
2.23
2.33
All over
850,000
2.04
2.13
2.22

The minimum charge for any user shall be based upon meter sizes, as follows:
Meter Size Charges
Phase I Rates1
Phase II Rates2
Phase III Rates3
5/8 inch water meter
$ 11.47
$ 11.99
$ 12.52
3/4 inch water meter
22.95
23.99
25.03
1 inch water meter
34.22
35.78
37.33
1 1/2 inch water meter
55.09
57.59
60.10
2 inch water meter
82.83
86.60
90.36
3 inch water meter
160.88
168.19
175.50
4 inch water meter
230.01
240.47
250.92
6 inch water meter
391.04
408.81
426.59
8 inch water meter
690.34
721.72
753.10
Notes:
1 Phase I will go into effect November 1, 2005.
2 Phase II will go into effect April 1, 2006.
3 Phase III will go into effect November 1, 2006.
Excess Strength Surcharge (Rate per Pound)
Phase I Rates1
Phase II Rates2
Phase III Rates3
BOD
$0.43
$0.45
$0.47
Total oil and grease
0.43
0.45
0.47
Suspended solids
0.43
0.45
0.47




Unmetered users
12.64
13.21
13.79




Two or More Businesses or Dwellings on a Single Meter



Additional charge for each unit served through a single water meter
2.61
2.73
2.84

For service rendered by the sewage treatment works to lots, parcels of real estate or buildings located outside the limits of the town of Speedway, the rates and charges, including minimum charge, shall be one hundred fifty percent of the above listed rates and charges. (Ord. 1047 §3, 2005: Ord. 1006 §3, 2004: Ord. 984 §3, 2002: Ord. 924 §1, 2000: Ord. 779 §1, 1990: Ord. 765 §1, 1989: Ord. 726 §1, 1985: Ord. 717 §1, 1985: Ord. 666 §1, 1981: Ord. 659 §1, 1981: Ord. 551 §2, 1976: Ord. 485 §1, 1972: Ord. 481 §1, 1972: Ord. 461 §1, 1971: Ord. 373 §1(part), 1966).