Chapter 13.44 EROSION AND SEDIMENT CONTROL
13.44.060 Inspection.
|
Sheet __of___
|
|
Project Name:___________________________________________ File
No.__________________
|
||
|
Inspection Date:_____________ Time:______________ Inspected
by:____________________
|
||
|
|
||
|
STAGE OF CONSTRUCTION
|
||
|
|
||
|
__Pre-Construction Conference
|
__Rough Grading
|
__Finish Grading
|
|
__Clearing and Grubbing
|
__Building Construction
|
__Final Stabilization
|
|
|
||
|
INSPECTION CHECKLIST
|
||
|
|
|||||
|
Yes
|
No
|
NA
|
|
||
|
[]
|
[]
|
[]
|
Have all denuded areas requiring temporary or permanent stabilization been
stabilized?
|
||
|
|
|
|
Seeded? yes/no
|
Mulched? yes/no
|
Graveled? yes/no
|
|
[]
|
[]
|
[]
|
Are soil stock piles adequately stabilized with seeding and/or sediment
trapping measures?
|
||
|
[]
|
[]
|
[]
|
Does permanent vegetation provide adequate stabilization?
|
||
|
[]
|
[]
|
[]
|
Have sediment trapping facilities been constructed as a first step in
LDA?
|
||
|
[]
|
[]
|
[]
|
For perimeter sediment trapping measures, are earthen structures
stabilized?
|
||
|
[]
|
[]
|
[]
|
Are sediment basins installed where needed?
|
||
|
[]
|
[]
|
[]
|
Are finished cut and fill slopes adequately stabilized?
|
||
|
[]
|
[]
|
[]
|
Are on-site channels and outlets adequately stabilized?
|
||
|
[]
|
[]
|
[]
|
Do all operational storm sewer inlets have adequate inlet protection?
|
||
|
[]
|
[]
|
[]
|
Are stormwater conveyance channels adequately stabilized with channel
lining and/or outlet protection?
|
||
|
[]
|
[]
|
[]
|
Is in-stream construction conducted using measures to minimize channel
damage?
|
||
|
[]
|
[]
|
[]
|
Are temporary stream crossings of non-erodible material installed where
applicable?
|
||
|
[]
|
[]
|
[]
|
Is necessary restabilization of in-stream construction complete?
|
||
|
[]
|
[]
|
[]
|
Are utility trenches stabilized properly?
|
||
|
[]
|
[]
|
[]
|
Are soil and mud kept off public roadways at intersections with site access
roads?
|
||
|
[]
|
[]
|
[]
|
Have all temporary control structures that are no longer needed been
removed?
|
||
|
[]
|
[]
|
[]
|
Have all control structure repairs and sediment removal been
performed?
|
||
|
[]
|
[]
|
[]
|
Are properties and waterways downstream from development adequately
protected from erosion and sediment deposition due to increases in peak
stormwater runoff?
|
||
|
|
|||||
|
Comments:___________________________________________________________________________
|
|||||
|
____________________________________________________________________________________
|
|||||
|
____________________________________________________________________________________
|
|||||
|
____________________________________________________________________________________
|
|||||
|
Verbal/Written notification given
to:_______________________________________________
|
|||||
|
Report
by:______________________________________________ Date:_________________
|
|||||